WindSite Project Overview
WindSite places wind turbines on a map and checks every position against the siting rules: statutory distances, the client's own limits, land, forest, terrain, and wind. It replaces dated scripts and spreadsheets with one shared, versioned record.
A position never changes for the ground team or the client without a reviewed run and a publication. The platform is built for many wind projects, and its first project assesses 185 turbine positions at a wind site in Gujarat.
From Draft to Published Version
Data
Project boundary, roads, lines, water, forest, villages, buildings, parcels, other developers' turbines, wind atlas, and elevation model.
Draft
The office moves, adds, and drops positions. Every edit is assessed at once, in the draft only.
Run
A recorded analysis over a chosen scope, with run parameters such as turbine, hub height, setback, and spacing.
Review
Every changed position is accepted or held, in a table or one by one on the map.
Publish
An admin freezes the accepted positions as a new version.
Use
The field app, the client login, batches, and all reports read the published version only.
Inside the Platform
Positions in category colours over the project boundary, no-go zones, roads, forest, buildings, and other developers' turbines.
Select a position and every check opens with its value, limit, status, and basis. A failed distance shows how far to move, and the setback and spacing rings are drawn on the map.
A queue of unreviewed footprints near each position, marked as dwelling, shed, false positive, or abandoned. Each decision re-grades the affected positions.
A wind rose with the prevailing direction, alongside Global Wind Atlas overlays up to hub height.
The run parameters and the rules behind them, each tagged with its basis, such as MNRE guidelines, the Forest Act, or the client's own limits.
A funnel from all positions down to those ready to offer, beside the checks that block the most positions.






Eight Check Groups
A full run takes each position through all eight groups. The limits come from the project's rule set and follow the turbine chosen.
Inside the project boundary, and outside sanctuary and defence areas.
5D × 7D against other developers' turbines and the project's own, with a 4D floor between the project's own.
Roads, rail, EHV lines, and water, at hub height plus half the rotor diameter plus 5 m.
500 m from clusters of 15 or more dwellings and from village or residential areas, with single dwellings checked against the client's limit.
Outside forest areas, with a buffer around them.
Slope at the position and around it, from the elevation model.
Survey number and parcel checks, including shared parcels and pads that touch several parcels.
Estimated PLF from the wind atlas, a wake estimate, and measured data from wind masts when they are uploaded.
Key Capabilities
Field app
A phone app for the ground team with offline maps, GPS, checklists, photos, and a turning video from each position.
Land alternatives
A 20 m grid within 500 m of a position tests every cell against all the rules, ranks the plots that pass, and can propose a move for review.
Wind masts
Upload a logger export to read mean speeds, Weibull values, shear, and the wind rose, then apply it to the analysis.
Reports and exports
DP report, field pack, site schedule, MIS workbook, and sites as CSV or KML.
Reference layers
Administrative boundaries, seismic zones, river basins, and protected areas read live from public services.
Companies and roles
Modules and projects are set per company, with admin, analyst, land team, ground team, and client logins.
Conclusion
WindSite gives a wind project one record of every position: what changed, which checks it passes, and which version the field team and client can see. A logged re-assessment of all 185 positions took 3.45 seconds.